双边规格的CPK如何计算

昨天(3/29)与IQC的部分同仁一起探讨了双边规格的CPK如何计算。今天想起来,仍然觉得意味尤尽,特意在此再温习一遍.

Quality assurance and improvement

Compatibility of mechanical parts:
To save money by minimizing scrap
To save time by minimizing inspection
To collect data from part dimension variation  during the life cycle of the mould.
To establish a data bank of process outputs and capability analyses
Impact on design and mechanical solutions
Statistical dimensioning/tolerance design (VSA - simulation tool)
 Cumulative know-how - feedback from previous    projects。
What is the difference between Cp&Pp,Cpk&Ppk
Standard deviation is calculated differently :
Process capability:Cp&Cpk--Short term standard deviation.
(common causes).
sST doesn’t account for the long time variation (e.g. tool wear, material changes).
Process performance:Pp&Ppk-->Long term standard deviation.
(common and special causes).
 Capability index: Cp -->the process is capable of reproducing the characteristic. Cpk-->The process is actually reporducing the characteristic within desired limits.
Most of companies requirement :Cpk should not be less than 1.33.  
If these indexes are small we may have to consider some of the following:
are the tolerance limits set correctly
 to use for example Design of Experiments to improve the process
 to invest in new technology
 The difference between Cpk and Ppk indexes indicates how much we can possibly improve our process by using process control.
 
What Do These Indexes Tell Us ?
 
Simple numerical values to describe the quality of the process 
Requirement for Cpk is 1.67
This leaves us some space for the variation
 Are we able to improve our process by using SPC
If  index is low, following things should be given a thought:
Is the product design OK?
Are tolerance limits set correctly?
Too tight?
Is the process capable of producing good quality products?
Process variations?
Is the measuring system capable?
Porcess capability accurancy :Ca=(Average-Mean)/(Torlance/2).
Porcess capability precision :Cp=Torlance/(6*standard deviation).
Standard deviation = SQRT([(X1-M)^2+(X2-M)^2+(X3-M)^2+...+(Xn-M)^2]/(n-1))
Cpk=(1-|Ca|)*Cp=Min{Cpu,Cpl}.


论坛讨论: http://my.6sq.net/?uid-105820-action-viewspace-itemid-33215

TAG: 一日三省
查看全部1条评论

最新评论

  • 删除 引用 jessica.ben (2008-5-04 14:32:40, 评分: 0 )

    To save money by minimizing scrap
    •To save time by minimizing inspection
 

评分:0

我来说两句