APQP management:
1/ The process for manufacturing, checking and recording results of products has to be described with an APQP planning (attachment 1);
2/ Product/Process feasibility Check-list (attached 2) has to be filled by the supplier;
3/ A rating system based on the FMEA method shall give a priority for preventive actions. A pareto analysis of the risk criteria to design the preventive action plan could be required.
4/ Control plan is defined for each operation in order to identify the checking operation.
5/ Capability studies are used to asses whether the process or the machine could manufacture the product in serail conditions. In front of the results the suppliers has to decide what type of control plan to achieve.
6/ APQP review are stated by M.A. for the common verification of the planning fullfilment.
最新回复
aong (2006-9-05 10:06:22)
Gavin333 (2006-9-05 10:59:55)
stefanie (2006-9-05 11:05:17)
阳春白雪 (2006-9-05 11:11:04)
jxcyf (2006-9-05 11:30:05)
林子 (2006-9-05 11:34:41)
QUOTE:
绝对正确.hutu00 (2006-9-05 11:36:51)
yy1982 (2006-9-05 11:41:40)
allenxhw (2006-9-05 12:26:39)
我发现很受激励的
原来我也不知道
stone_tong2000 (2006-9-05 14:28:41)
zcbear (2006-9-05 14:36:28)
zhuxiaoyi (2006-9-05 14:45:03)
HUANGGUOZHENG (2006-9-05 15:48:53)
huangyuwen29 (2006-9-05 15:59:58)
005599 (2006-9-05 16:08:29)
1/ The process for manufacturing, checking and recording results of products has to be described with an APQP planning (attachment 1);
2/ Product/Process feasibility Check-list (attached 2) has to be filled by the supplier;
3/ A rating system based on the FMEA method shall give a priority for preventive actions. A pareto analysis of the risk criteria to design the preventive action plan could be required.
4/ Control plan is defined for each operation in order to identify the checking operation.
5/ Capability studies are used to asses whether the process or the machine could manufacture the product in serail conditions. In front of the results the suppliers has to decide what type of control plan to achieve.
6/ APQP review are stated by M.A. for the common verification of the planning fullfilment.
heyinghuhui (2006-9-05 16:09:19)
dreamsun (2006-9-17 08:38:23)
cykcp (2006-9-17 08:59:45)
再详细点说:我们公司如果RPN超过56就要进行预防措施分析,如果低于56,但是严重度超过9也要进行分析,严重度如果达到9的话,一旦出现问题后果很严重的说。所以一定要重点关注
wagbo (2006-9-17 13:11:12)
bbozhang (2006-9-17 14:34:13)