VSM data box

OCT= Time ---------Operator Cycle Time
MCT= Time ---------Machine Cycle Time
D/R= Time ---------Drop Off Rate( How often a finished part is completed off the end of the process)
PLT= Time ---------Process Lead Time
BATCH= pieces  ----Batch Size
PTP = Time  -------Process Time Per Piece
PEJ = %   ---------Reject Rate
U/T = %   ---------Uptime
C/O= Time ---------Changeover Time
EPE= Time ---------Every Part Every (How often every part number is run though the process,setup Wheel)
PITCH= Time  ------Pitch interval
T/T  =Time   ------Takt Time
SH = #       ------Number of the shift this process is run
我也来说两句 查看全部回复

最新回复

  • kofzhang (2008-7-02 08:27:47)

    学习下!

    哎,.真希望以后工作能用到啊!