1。Apply project management processes and methodologies to FMEA work; in other words, projectize FMEAs.
2。Ensure that the FMEA to be undertaken is occurring early in the Product Development Process (PDP
3。Commit yourself to doing upfront research before launching the FMEA project.
4。Identify an appropriate FMEA sponsor to represent the best interests of the team.
5。Ensure that the right people who possess the necessary knowledge, skills, and attitudes are responsible for executing the FMEA work.
6。See that an experienced FMEA expert with a solid technical background facilitates the FMEA sessions.
7。Avoid getting caught-up in FMEA technology; a simple electronic spreadsheet and an overhead projector may be all that you need.
8. Standardize the scales used to measure the three components of FMEAs - Severity, Occurrence, and Detection (SOD
9。Engage in risk reduction not number reduction.
10. Implement a thorough review process where lessons learned are logged and made readily available so that rework is minimized and the FMEA learning process is streamlined
最新回复
Adele (2005-12-12 21:06:52)
aiyinsitan (2005-12-12 21:12:22)
QUOTE:
充其量是一种分析问题的方法而已,不一定必须使用,由于里面对RPN的系数规定和评价在某种程度上带有很大的主观性,所以对于那些经验丰富的人更实用,对于新手,作用不大虫子和猪猪 (2005-12-13 09:30:27)
还有没有新的观点
Allio (2005-12-13 09:42:11)
2。Ensure that the FMEA to be undertaken is occurring early in the Product Development Process (PDP
3。Commit yourself to doing upfront research before launching the FMEA project.
4。Identify an appropriate FMEA sponsor to represent the best interests of the team.
5。Ensure that the right people who possess the necessary knowledge, skills, and attitudes are responsible for executing the FMEA work.
6。See that an experienced FMEA expert with a solid technical background facilitates the FMEA sessions.
7。Avoid getting caught-up in FMEA technology; a simple electronic spreadsheet and an overhead projector may be all that you need.
8. Standardize the scales used to measure the three components of FMEAs - Severity, Occurrence, and Detection (SOD
9。Engage in risk reduction not number reduction.
10. Implement a thorough review process where lessons learned are logged and made readily available so that rework is minimized and the FMEA learning process is streamlined
当时培训教材上关于DFMEA,分享给你,没时间翻译给你了。
wxlujing (2005-12-13 09:48:08)
QUOTE:
不错。FMEA要成功地开展需要比较多的经验或者是对员工的培训。FMEA是一种很好的分析方法,但因为打分主观性比较强,要能真正起到作用,需要通过培训统一小组成员的打分标准虫子和猪猪 (2005-12-13 09:56:01)
mgq139 (2005-12-13 19:48:21)
双子星 (2006-3-18 00:26:24)
Kevin888 (2006-3-29 17:04:20)